- Bay distance: 11.5m; span distance: 23m
- 3-4 sets of industry lifting door applied to each cell, and 3 sets of lifting doors and lift platform reserved
- Wall insulation & liner panel to achieve thermal property
- Power configuration 15W/m²; power distribution 2000kVA
- Fire system: ESFR, fire hydrant system, air sampling alarm system
- Air ventilation system
- 630kW standby diesel generator
- CCTV monitoring and infrared alarm system
![1ewuhan FC](https://esrassets.s3.ap-southeast-1.amazonaws.com/esr_dev/uploads/2022/11/30021912/1ewuhan-FC.png)
![1ewuhan FC (1)](https://esrassets.s3.ap-southeast-1.amazonaws.com/esr_dev/uploads/2022/11/30021922/1ewuhan-FC-1.png)
/
Specifications
Structure
Single floor pre-engineering steel structure
Construction Area (m²)
89,623
Land Area (m²)
153,128
Time of Completion
Q1 2016